| Description of Costs |
Bid
Amount |
Paid
Amount |
Subcontractor
or Supplier |
| A.
Miscellaneous Costs |
|
|
|
| 1.
Lot Cost |
|
|
|
| 2.
Arch & Eng Fee |
|
|
|
| 3.
Surveyor |
|
|
|
| 4.
Other Misc Costs |
|
|
|
| 5.
|
|
|
|
| 6.
|
|
|
|
| 7.
|
|
|
|
| B.
General Costs |
|
|
|
| 1.
Permits |
|
|
|
| 2.
Insurance, Warranties |
|
|
|
| 3.
Inspections |
|
|
|
| 4.
Temporary Facilities |
|
|
|
| 5.
Supervision |
|
|
|
| 6.
Overhead |
|
|
|
| 7.
Profit |
|
|
|
| 8.
Clean-Up |
|
|
|
| 9.
|
|
|
|
| 10.
|
|
|
|
| Description
of Costs |
Bid
Amount |
Paid
Amount |
Subcontractor
or Supplier |
| C.
Site Work |
|
|
|
| 1.
Septic System |
|
|
|
| 2.
Excavation & Backfill |
|
|
|
| 3.
Off-Sites |
|
|
|
| 4.
Hardscape & Driveways-Framing |
|
|
|
| 5.
Landscape |
|
|
|
| 6.
Demolition |
|
|
|
| 7.
Irrigation |
|
|
|
| 8.
Driveway |
|
|
|
| 9.
|
|
|
|
| 10.
|
|
|
|
| D.
Concrete |
|
|
|
| 1.
Footings & Foundations |
|
|
|
| 2.
Floor Slabs |
|
|
|
| 3.
Structural Concrete |
|
|
|
| 4.
|
|
|
|
| E.
Masonry |
|
|
|
| 1.
Unit Masonry |
|
|
|
| 2.
Masonry Veneer |
|
|
|
| 3.
|
|
|
|
| 4. |
|
|
|
| 5.
|
|
|
|
| 6.
|
|
|
|
| Description
of Costs |
Bid
Amount |
Paid
Amount |
Subcontractor
or Supplier |
| F.
Metals |
|
|
|
| 1.
Structural Metal Framing |
|
|
|
| 2.
Structural Steel |
|
|
|
| 3.
Miscellaneous Metal |
|
|
|
| 4.
|
|
|
|
| 5. |
|
|
|
| G.
Carpentry |
|
|
|
| 1.
Framing Lumber |
|
|
|
| 2.
Rough Carpentry |
|
|
|
| 3.
Mill Work |
|
|
|
| 4.
Finish Carpentry |
|
|
|
| 5.
Cabinets & Counters |
|
|
|
| 6.
Log Package |
|
|
|
| 7.
|
|
|
|
| H.
Thermal/Moisture |
|
|
|
| 1.
Flashing |
|
|
|
| 2.
Vapor Barrier |
|
|
|
| 3.
Gutters & Downspouts |
|
|
|
| 4.
Water & Damp Proofing |
|
|
|
| 5.
Insulation |
|
|
|
| 6.
Roofing |
|
|
|
| 7.
Exterior Wall Finish |
|
|
|
| 8.
Sealants & Caulking |
|
|
|
| 9.
|
|
|
|
| Description
of Costs |
Bid
Amount |
Paid
Amount |
Subcontractor
or Supplier |
| I.
Doors, Windows, Glass |
|
|
|
| 1.
Windows |
|
|
|
| 2.
Interior Doors & Frames |
|
|
|
| 3.
Exterior Doors & Frames |
|
|
|
| 4.
Garage Doors |
|
|
|
| 5.
Glass & Glazing |
|
|
|
| 6.
Finish Hardware |
|
|
|
| 7.
|
|
|
|
| J.
Finishes |
|
|
|
| 1.
Painting-Interior |
|
|
|
| 2.
Painting-Exterior |
|
|
|
| 3.
Gypsum Board |
|
|
|
| 4.
Lath & Plaster |
|
|
|
| 5.
Wall Coverings |
|
|
|
| 6.
Floor Coverings |
|
|
|
| 7.
Tile |
|
|
|
| 8.
|
|
|
|
| 9.
|
|
|
|
| K.
Specialties |
|
|
|
| 1.
Fireplace |
|
|
|
| 2.
Fire Sprinkler System |
|
|
|
| 3.
|
|
|
|
| 4.
|
|
|
|
| 5.
|
|
|
|
| Description
of Costs |
Bid
Amount |
Paid
Amount |
Subcontractor
or Supplier |
| L.
Equipment |
|
|
|
| 1.
Appliances |
|
|
|
| 2.
Other |
|
|
|
| 3.
|
|
|
|
| 4.
|
|
|
|
| 5.
|
|
|
|
| 6.
|
|
|
|
| 7.
|
|
|
|
| M.
Special Construction |
|
|
|
| 1.
Outbuildings |
|
|
|
| 2.
Special Purpose Rooms |
|
|
|
| 3.
Swimming Pool & Spa |
|
|
|
| 4.
Saunas |
|
|
|
| 5.
|
|
|
|
| 6.
|
|
|
|
| 7.
|
|
|
|
| 8.
|
|
|
|
| 9. |
|
|
|
| Description
of Costs |
Bid
Amount |
Paid
Amount |
Subcontractor
or Supplier |
| N.
Mechanical |
|
|
|
| 1.
Sewer & Water |
|
|
|
| 2.
Well |
|
|
|
| 3.
Rough Plumbing |
|
|
|
| 4.
Plumbing Fixtures |
|
|
|
| 5.
Plumbing Finish |
|
|
|
| 6.
HVAC-Underground |
|
|
|
| 7.
HVAC-Rough In |
|
|
|
| 8.
HVAC-Equipment |
|
|
|
| 9.
HVAC-Final |
|
|
|
| 10.
|
|
|
|
| 11.
|
|
|
|
| O.
Electrical |
|
|
|
| 1.
Electrical-Services Entrance |
|
|
|
| 2.
Electrical-Rough In |
|
|
|
| 3.
Electrical-Load Controller |
|
|
|
| 4.
Electrical-Fixtures |
|
|
|
| 5.
Electrical-Finish |
|
|
|
| 6.
Alarm System & Low Voltage |
|
|
|
| 7.
|
|
|
|
| 8.
|
|
|
|
| P.
System Built Package |
|
|
|
| 1.
Materials Package |
|
|
|
| 2.
Freight Charges |
|
|
|
| 3.
|
|
|
|
| Q.
Financing |
|
|
|
| 1.
Closing Costs (Construction Loan) |
|
|
|
| 2.
Interest Reserve (if applicable) |
|
|
|
| 3.
|
|
|
|
|
Line Item Grand Total |
|
|
|